| Risk Assessment Dropdown Viewer | | | | |
| Select one risk assessment from the dropdown and the full record is pulled from the RA Library. | | | | |
| Use the dropdown in B5. Entries show the controlled RA ID and a descriptive title so the correct assessment can be identified quickly. | | | | |
| Selector | Value | | Selected Risk Assessment Detail | |
| Select Risk Assessment | | | | |
| Activity | | | Hazard | |
| Sector | | | | |
| Category | | | | |
| Residual Risk | | | Persons at Risk | |
| | | | |
| | | | |
| Risk Scoring | Value | | Control Measures | |
| Initial L | | | | |
| Initial S | | | | |
| Initial Score | | | | |
| Residual L | | | | |
| Residual S | | | | |
| Initial Level | | | | |
| Residual Level | | | PPE / Equipment | |
| | | | |
| | | | |
| | | Further Actions | |
| | | | |